Characteristics: Fast charging with intermittent use throughout the day.
Typical Generator Size: 100kVA
Job Length: 180 Days
What Will Be Powered: 4x 22kW Chargers, 4x 7kW Chargers
Running Hours: 28
The testing of fast charging station in a location before a permanent solution is developed i.e. grid connection is provided.
Site Preparation: 8 Hours | Commissioning: 2 Hours | Decommissioning: 5 Hours
Total kWh: 6,496
Base kW: 116
Peak kW: 81
Hydrogen (kg): 390
Space Required: 18.5m x 16.5m
Diesel Used (liters): 3,200
Diesel Efficiency: 20%
Diesel Emissions (kg): 74,000
CO2e Saved
Hydrogen generator deployments, currently, require additional steps and processes when compared to diesel.
At Hydrologiq we ensure that all deployments run smoothly by providing our advisory and managed deployment services. Our experience, expertise and network provide you with the easiest way to get hydrogen deployed today.
Here are just a few of the steps we take:

Learn more about our deployments
Hydrologiq deployed a hydrogen-powered BEV (battery electric vehicle) charging station for Toyota GB at the Cenex LCV event to showcase their range of zero-emission vehicles.

a trading name of

Links

© 2026 HYDROLOGIQ LTD | Company Number: 12449466 | Terms of Business | Privacy Policy | Modern Slavery Policy